Warbud will build as a consortium partner a 650 m section of the Warsaw – Krakow road between the localities of Salomea and Wolica. Warbud will build 6 viaducts, an underground passage and a pedestrian bridge and will also rebuild the railway systems (power cables, railway traffic control systems, PKP-WKD telecommunication cables, catenary network etc.)
Warbud SA has signed a contract for the rebuilding and extension of the Department of Internal Medicine and Cardiology of the Hospital of the Infant Jesus and the Injury Treatment Centre situated at no. 4 Lindleya St. in Warsaw. The contract with the Client - the Infant Jesus Clinical Hospital was signed on December 17, 2010.
Three Warbud employees: Ms Jolanta Grocholska, Board Member, Mr Jozef Kopec and Mr Boleslaw Kot have received awards for their contribution to the building industry. The medals presentation ceremony took place on December 9 during the “Building Industry Christmas Eve 2010” in Warsaw. The medals are awarded to persons with outstanding achievements and contributions in the fields of architecture and construction.
Warbud will build strengthening structures of the Gdansk Bay in the area of Westerplatte with a length of 971 m. The object of the contract signed on December 3, 2010 is the construction of a seawall of the Gdansk Bay (the section from km 67.580 to 68.470) in the city of Gdansk located between the western breakwater of the North Port and the eastern breakwater at the mouth of the Dead Vistula.
Warbud will build two apartment blocks (A and B) in the housing estate with underground garages at ul. Krasinskiego in Szczecin. The development project will be implemented in several phases. In the first phase Warbud build two 4 to 5-floor buildings with 82 apartments, ranging in size from 36 to 98 m².